Waterproofing

Pile Head Treatment

In the construction site and after finishing the piles work, the pile head exists normally with an un-even finishing and in order to continue with the construction work to the second stage and make a concrete slab, the pile head should be treated and on then add to the Cap high concrete strength.

5 Steps to get Pile Treatment Solution

The cement and epoxy-based products are ideal for this application. The pile head treatment before applying any of concrete repair products and the following steps are to be considered:

Surface Preparation

Remove dust, oil and any remainders by using fresh water only; all substrate must be sound and clean. All damaged concrete must be broke out and remove all week concrete. The concrete should be at least 28 days old.

Shuttering

The shuttering should be done on all sides of the pile and within enough heights to reach the slab level required (100 -200mm), after damping the shutter with fresh water the pile is ready for two steps of applying concrete repair product cement base and the epoxy one as a final layer.

Adjustment cap

For the cap, adjustment the three components cement base product is to be used Afterwards, mix the three components together with fresh water. The mixed products should be poured in the shattering with a thickness of 50-150 mm, Flowability characteristic of the product will enable a self-leveling action and the help with steel trowel is always recommended. The finished product is to be covered with polyethylene sheet for 24 hours before applying the second step of the system.

Final cap

After mixing the three component together and to obtain a uniform epoxy mortar, add the graded aggregates (part C) to the epoxy fluid while mixing for 2 to 3 minutes. One full kit should be mixed and the application should be carried out in a fast manner. The mixed product is to be poured on a dry surface in the shattering with a thickness of 10 – 50 mm, on top of Adjustment CAP. The flowability characteristic of the product will allow a self-leveling action and the help with steel trowel is always recommended. The finished product will be set within 2 – 5 hours.

Important Tags: Waterproofing Company in UAE, Insulation Company near you, Tahir Amin, Waterproofing Company in Sharjah, Pile Head Treatment

taic

Share
Published by
taic

Recent Posts

Importance of GRP Lining for Household Waterproofing

Coating your home with the right materials to protect it from the water intrusion is paramount.…

5 years ago

Five Things You Should Consider Before Doing a Bathroom Renovation

Bathroom renovation should begin with proper planning. Failure to do this means that you may…

5 years ago

The Reasons of Bathroom waterproofing in UAE

Why is Bathroom Waterproofing Important? Of all areas of a house, the bathroom is the…

5 years ago

Reasons why waterproofing is important in UAE

Waterproofing is a fundamental construction requirement. Modern buildings are waterproof, using membranes and coatings to…

5 years ago